1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 7.00 LPA
Plant Operations
Ensure smooth and continuous operation of WTP units including intake systems, clarification, filtration, and disinfection.
Monitor plant performance parameters (flow, turbidity, pH, residual chlorine, etc.).
Ensure treated water quality meets statutory and client specifications.
Optimize chemical dosing and power consumption.
2. Maintenance Management
Plan and implement preventive & predictive maintenance schedules.
Oversee mechanical, electrical, and ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
4.00 LPA TO 5.50 LPA
Key Responsibilities
1. Plant Operation & Performance
Supervise daily operation of STP and ETP units to ensure efficient treatment results.
Monitor process parameters (flow, turbidity, BOD/COD, sludge levels).
Optimize treatment processes to achieve regulatory compliance.
2. Maintenance & Troubleshooting
Conduct preventive and corrective maintenance of mechanical, electrical and process equipment.
Diagnose plant malfunctions and coordinate repairs.
Ensure ...
1 Opening(s)
0 To 2.0 Year(s)
2.00 LPA TO 4.00 LPA
🎯 Job Summary:
The Safety Officer is responsible for developing, implementing, and monitoring safety protocols to ensure a safe working environment at the wastewater treatment facility. This role involves conducting risk assessments, training personnel, ensuring compliance with safety regulations, and responding to emergencies.
🛠️ Key Responsibilities:
Safety Program Development & Implementation
Develop and ...
1 Opening(s)
10.0 Year(s) To 12.0 Year(s)
8.00 LPA TO 10.00 LPA
A. Purpose /Role of the joC. Responsibilities/ Accountabilities of the job: Describe the main results expected from the job1. Key Result Areas: Key Result Areas: Incident free operations, Adherence to INEOS Styrolution SHEguidelines, Compliance with local regulations.Major Activities: Participate on regular safety training at site:o Safety rules and guidelineso Operating ...
1 Opening(s)
15.0 Year(s) To 20.0 Year(s)
22.00 LPA TO 25.00 LPA
Job title:Production Manager, Nandesari
Name of job holder:
Department/service:Operations / Manufacturing
Signature job holder & date:
Signature hierarchical head & date:Plant Manager – Nandesari
Signature functional head & date:Director – Manufacturing, India
A. Purpose /Role of the job /: Describe in 1 phrase what contribution the job is expected tomake to the organisation’s objectivesLead the team ...