Responsibilities of project basic Engineering, details engineering,construction andcommissioning.● Selection of electrical equipment compatible with project and maintenance purpose.● introduce New design guidelines which to be used for projects and maintenance forselection of equipment.● safety and quality maintained at site execution.● timely complete project for handover and smooth process.
Responsible for the ...
1 Opening(s)
13.0 Year(s) To 18.0 Year(s)
Not Disclosed by Recruiter
Provide instrumentation & Automation expertise to project team for CapEx projects by providing lead inProject management, Engineering (Basic & Detail), Engineering coordination during procurement,construction and commissioning, with the perspective of Instrumentation & Automation, and with a SHEmindset. Lead in Instrumentation & Automation based Capex projects from ‘Concept to commissioning’. ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
15.00 LPA TO 20.00 LPA
Projects Requirement Capturing from O&M Team
Project engineering especially provide expertise for Equipment & Piping Engineering
Project Cost Estimation & Proposals
Project planning, scheduling and monitoring
Projects procurement including construction contract / services
Project Execution and Construction Management
Prepare project cost estimate and project proposals
Plan, Schedule, coordinate & manage assigned projects and as discipline support
Coordinate, follow-up ...
1 Opening(s)
8.0 Year(s) To 10.0 Year(s)
9.00 LPA TO 12.00 LPA
Prepare day-to-day activity report, Project Discussion with Management & Team. Project Planning as per timeworkand conditions.Certification of Bills and Verify & Check Checklist and Callahan.Achieve Quality Assurance on site for each and every activity and Follow QAP, ITP.Study & Prepare Cost Estimate for Projects, Management.Prepare completion within budget, with quality, ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
6.00 LPA TO 8.50 LPA
Purpose:Ensure timely support in smooth execution of Project Utility activities to meet stipulated timelines as perthe Safety & Quality standards.
Challenges of the role:• Behaviour based safety in contract labour working in Project activities• Technical Analysis of the problems for taking corrective actions to avoid repeated failures.• Changeover executions In Utilities ...
1 Opening(s)
6.0 Year(s) To 12.0 Year(s)
10.00 LPA TO 14.00 LPA
Identifying scope for energy savings projects.
Saving potential workout, CAPEX ROI prevalidation with technical & finance team.
ENCON project conceptualization to commissioning
ENCON project post commissioning assessment & ROI post validation with technical & finance team.
Integration of energy efficiency in utility selection for new green field projects
Techno financial discussions
Presentation preparation of ongoing activities ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
10.00 LPA TO 14.00 LPA
Execute process engineering deliverables during project execution phase.
Support in commissioning & start-up activities of new plants and modifications.
Coordinate with process design team, project team, and site execution team to ensure smooth implementation.
Review and validate PFDs, P&IDs, equipment datasheets, and process calculations during execution stage.
Supervise installation and commissioning of process equipment ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
18.00 LPA TO 22.00 LPA
• Understand core process from licenser or with our R&D team.• Prepare and work out BEP with consultant / R&D team.• Finalize & freeze process, storage, utility requirement, effluent treatment scope.• Prepare and support project manager to finalize capex.• Support project manager to expedite long lead items and technical discussion ...
1 Opening(s)
9.0 Year(s) To 11.0 Year(s)
12.00 LPA TO 16.00 LPA
Job Description:
Designation
Assistant Manager
Department
Finance Controller
Qualification
CMA / ICWA /CA Inter Or equivalent
Experience
Min. 9 years
Location
Dahej
CTC
Up to 12 lacs
No of vacancy
1 – Only Male candidate
Job Role
Permanent
Skills required for position :
Product costing. System control, accuracy, and deviation analysis
Plant spent analysis
Any new project, modification cost and feasibility evaluation at Karakhadi & Moxi
Budget for plants and monitor actual ...
2 Opening(s)
5.0 Year(s) To 8.0 Year(s)
Not Disclosed by Recruiter
Plan and execute allocated contract-related activities within defined timelines, in line with the approved project plan.
Follow established engineering design processes and issue drawings and Bills of Material (BOM) using the designated CAD system.
Design parts and assemblies with a focus on cost optimization while maintaining required quality standards.
Coordinate prototype builds to ...